Sample Loss Ledger

This is an example of the Loss Ledger you'll receive as part of your Operational Loss Assessment. Actual deliverables are customized to your specific operations and data.

$2.47M
Total Annual Loss
5
Major Loss Categories
4
Repeat Patterns Identified
$1.2M
90-Day Recovery Target

Loss Ledger - Top 5 Loss Drivers

Ranked by annual financial impact

RankLoss CategoryAnnual LossFrequencyRoot Cause
1
Unplanned Downtime - Line 3$847,00047 eventsBearing failures in conveyor system
2
Quality Scrap - Station 7$612,000DailyCalibration drift on sensor array
3
Changeover Delays$483,00012x/weekMissing standard work procedures
4
Rework - Assembly Area$291,0008%% rateTraining gap on new operators
5
Material Shortages$234,0003x/weekKanban signals not maintained

Repeat-Loss Map - Pattern Analysis

Recurring issues and their triggers

Monday AM Startups
High Impact

68% of Line 3 failures occur within 2 hours of Monday startup

Shift Handoff Gaps
High Impact

Quality issues spike 40% during shift transitions

Temperature Sensitivity
Medium Impact

Scrap rate doubles when ambient temp exceeds 78°F

PM Schedule Drift
Medium Impact

Maintenance events pushed back average 4.2 days from schedule

90-Day Recovery Plan Preview

Prioritized actions with expected impact

P1

Implement predictive maintenance on Line 3 conveyor bearings

Days 1-30

$423K savings

P1

Deploy automated calibration alerts for Station 7 sensors

Days 1-30

$306K savings

P2

Standardize changeover procedures with visual work instructions

Days 31-60

$241K savings

P2

Structured onboarding program for new assembly operators

Days 31-60

$145K savings

P3

Kanban system audit and reset

Days 61-90

$117K savings